gantry Crane Accident Handling Plan (for reference only)
Many jobs are accompanied by some dangers, such as the use of gantry cranes. After a gantry crane accident occurs, on-site personnel should not panic and should do four things at the same time: report to superiors in a timely manner; Rescue the wounded; Eliminate dangerous situations and prevent the spread of accidents; To protect the accident scene, it is necessary to conduct it in an organized, directed, and orderly manner to avoid mistakes in chaos.
Before the person in charge of the gantry crane accident arrives at the scene, the high-level person in charge at the accident site should take on the organization and command of emergency response. At this time, there are four things to do:
Stop panic and chaos;
Quickly evacuate personnel from the dangerous area;
Rescue the injured. When rescuing the injured and carrying out rescue work, do not allow the injury to expand. After the person in charge arrives, immediately report the situation truthfully.
Carry out work to eliminate dangerous situations and prevent the spread of accidents in urgent and confident situations;
After the person in charge arrives, they should quickly understand the gantry crane accident and organizational arrangements, and command the reporting to superiors, rescue, elimination, and protection work. Commanders must maintain a calm mind and prevent any mistakes in command.
The work of rescuing the wounded, eliminating dangerous situations, and stopping the spread of accidents must be carried out under unified command. When dealing with a gantry crane accident, protective measures should be taken to prevent potential new hazards. The strict requirements and practices of “insurance first, rescue later, and elimination later” must be adopted to ensure that other aspects of the gantry crane will not have accidents again, in order to ensure the safety of rescue and risk relief personnel.
Strictly protect the scene, provide physical evidence and analysis basis for accidents and handling, and require the location and condition of various items on site to remain unchanged. When it is necessary to move due to the need to rescue the injured and eliminate them, a dedicated person should be arranged to mark the original state and take photos to record it. All possible measures must be taken to prevent human or natural factors from damaging the accident scene.
The final cleaning of the site must be confirmed and documented by the gantry crane accident investigation team before proceeding. Prior to this, personnel shall not use the excuse of resuming construction or clearing the site without authorization.